Certification of Capability in Business Analysis (CCBA) · IIBA
Select one answer.
Written by other learners. Comments can disagree with the marked answer — check the official documentation when in doubt.
When assessing proposed solutions, the inputs include: Solution options (A): The potential solutions to evaluate. Requirements (B): The criteria the solution must fulfill. Assumptions and constraints (D): Factors shaping solution feasibility. Risk assessments (C) are not an input but rather a technique or output of analyzing the solution’s risks during the assessment process. BABOK Reference (Chapter 6: Strategy Analysis - Assess Proposed Solution): Risk assessments are conducted during the evaluation of solutions, using inputs like requirements and constraints, but they are not a pre-existing input.
C. Risk assessments
C. Risk assessments