Hotspot Solution:
Click on the panel icon of PDU 1 in Rack 1. Change the PDU selection from A to B. This will balance the power load between UPS A and UPS B and resolve the alarm on UPS A. Click on the panel icon of PDU 2 in Rack 2. Change the PDU selection from A to B. This will balance the power load between UPS A and UPS B and resolve the alarm on UPS B. Click on VM Host 1 in Rack 1 and drag it to Rack 2. Drop it below VM Host 2. This will reduce the power consumption of PDU 1 in Rack 1 from 10A to 6A, which is below the 80% threshold of 9.6A. Click on Mail Relay in Rack 2 and drag it to Rack 1. Drop it below Firewall. This will increase the power consumption of PDU 1 in Rack 1 from 6A to 8A, which is still below the 80% threshold of 9.6A, and reduce the power consumption of PDU 2 in Rack 2 from 10A to 8A, which is also below the 80% threshold of 9.6A.
Written by other learners. Comments can disagree with the marked answer — check the official documentation when in doubt.
My answer: Rack 1: SW1 (2A), pduA/pduB VM1 (6A), pduA/pduB MAIL (1A), pduB/pduA Rack1 PDU A: 13A MAX, normal load: 8A Rack1 PDU B: 13A MAX, normal load: 7A Max shutdown time: 70mins Rack 2: SW2 (2A), pduA/pduB SAN (5A), pduA/pduB DC (3A), pduB/pduA VM2 (6A), pduB/pduA Rack2 PDU A: 12A MAX, normal load: 7A Rack2 PDU B: 12A MAX, normal load: 9A Max shutdown time: 65mins
Rack1: SW1 (2A), pduA/pduB SAN (5A), pduA/pduB VM1 (6A), pduB/pduA Rack1 PDU A: 13A MAX, normal load: 7A Rack1 PDU B: 13A MAX, normal load: 6A max shutdown time: 55mins Rack2: SW2 (2A), pduA/pduB DC (3A), pduA/pduB MAIL (1A), pduA/pduB VM2 (6A), pduB/pduA Rack2 PDU A: 12A MAX, normal load: 6A Rack2 PDU B: 12A MAX, normal load: 6A max shutdown time: 65mins
Click on the panel icon of PDU 1 in Rack 1. Change the PDU selection from A to B. This will balance the power load between UPS A and UPS B and resolve the alarm on UPS A. Click on the panel icon of PDU 2 in Rack 2. Change the PDU selection from A to B. This will balance the power load between UPS A and UPS B and resolve the alarm on UPS B. Click on VM Host 1 in Rack 1 and drag it to Rack 2. Drop it below VM Host 2. This will reduce the power consumption of PDU 1 in Rack 1 from 10A to 6A, which is below the 80% threshold of 9.6A. Click on Mail Relay in Rack 2 and drag it to Rack 1. Drop it below Firewall. This will increase the power consumption of PDU 1 in Rack 1 from 6A to 8A, which is still below the 80% threshold of 9.6A, and reduce the power consumption of PDU 2 in Rack 2 from 10A to 8A, which is also below the 80% threshold of 9.6A.