B because that prove the interaction. C is not correct, it's talk about no interaction during the sprint
B is correct since the approval of PO in the SR is needed. If that is achieved there was enough communication.
By inspecting the quality of the Increment, the Scrum Master can measure the level of interaction between the PO and Developer