- A Work Breakdown Structure (WBS) is a hierarchical decomposition of the total project scope into progressively smaller, manageable work packages. In construction, the WBS typically follows either a physical breakdown (by building system or area) or a process breakdown (by construction phase). Each work package can be scheduled, cost-estimated, assigned to a responsible party, and monitored. The WBS is the foundation for all project planning.