c is the correct answer
Official Cert Guide: CCNA 200-301 _ Wendell ODOM - Volume 2 - GLOSSARY: page 523 - "spine-leaf network A single-site network topology in which endpoints connect to leaf switches, leaf switches connect to all spine switches (but not to other leaf switches), and spine switches connect to all leaf switches (but not to other spine switches). The resulting topology results in predictable switching paths with three switches between any two endpoints that connect to different leaf switches. " Going by this, "C. A leaf switch can be added with connections to every spine switch" is the correct answer.
CORRECTION: Answer: C. A leaf switch can be added with connections to every spine switch. This allows for scalability in a network when additional access ports are required because each leaf switch can be connected to each spine switch, providing additional capacity and redundancy. This gives the network more flexibility in terms of scalability, making it easier to add more ports and expand the network as needed.